Rebuilding of Stern Boss Flange
Due to bimetallic corrosion the Stern tube Boss Seal Surface has been damaged and required by Class
to be reconstructed / recovered. Traditional rewelding and on-site machining sems too time consuming and is associated with huge costs, and further delays in the docking schedule would be a fact.
Damage due to bimetallic corrosion
The Stern Tube Boss Seal Surface suffered damage due to bimetallic corrosion, necessitating reconstruction or recovery as mandated by Class regulations.
Traditional rewelding and on-site machining methods are both time-consuming and costly, posing a significant risk of further delays in the docking schedule.
The Class Surveyor has confirmed that the physical properties of the Stern Tube construction remain sufficient. Therefore, the primary task was straightforward: rebuilding the deteriorated metal.